Description
Master your dog’s recall and distance control with the Hem and Boo Non-Slip Training Long Lead. Designed for effective training, this strong, padded lead features a specialized super grip texture that ensures a secure, comfortable hold even during active outdoor sessions.
-
Key Features:
-
Super Grip Texture: Engineered with a specialized non-slip surface to prevent slipping and ensure a firm hold during training.
-
Padded Comfort: Features integrated padding to protect your hands from friction when your dog pulls or runs.
-
Strong & Durable: Built with heavy-duty materials to withstand rigorous outdoor use and energetic dogs.
-
Recall and Distance Control: Perfect for practicing reliable recall, tracking, and distance obedience training.
-




Reviews
There are no reviews yet.