Previous
Previous Product Image

Hem and Boo Non-Slip Training Long Lead for Dogs

Original price was: £ 40.Current price is: £ 18.
Next

Bags on Board Waste Pick-Up Dog Waste Bags – 140 Count (10 Rolls)

Original price was: £ 10.Current price is: £ 6.
Next Product Image

Hem and Boo Orange Training Long Lead for Dogs – 5m, 10m, 15m

Original price was: £ 40.Current price is: £ 18.

  • -55%
Rated 0 out of 5
(0 customer reviews)

In stock

Shop the Hem and Boo Orange Training Long Lead. Strong, padded, and reflective in 5m, 10m, and 15m sizes for effective recall and distance control.

Description

Master your dog’s obedience and give them safe exploratory freedom with the Hem and Boo Orange Training Long Lead. Available in 5m, 10m, and 15m lengths, this high-visibility orange training lead is expertly designed to support reliable recall and distance control training while prioritizing comfort and durability.

  • Key Features:

    • Strong & Durable: Crafted with heavy-duty materials designed to withstand rigorous outdoor training and active dogs.

    • Padded Comfort: Features soft integrated padding to protect your hands from friction and strain during use.

    • Reflective Safety: Built-in reflective threading enhances low-light visibility for early morning or evening sessions.

    • Recall and Distance Control: Perfect for practicing long-distance obedience, tracking, and safe off-lead simulation.

Reviews

There are no reviews yet.

Be the first to review “Hem and Boo Orange Training Long Lead for Dogs – 5m, 10m, 15m”

Your email address will not be published. Required fields are marked *

worldwide

UK Delivery

Delivery across the UK. Charges and times are shown at checkout.

secure-payment

Secure Checkout

Pay safely with trusted payment methods.

return

Easy Returns

14 days to change your mind, 30 days for faulty items.

help-center

Customer Support

We reply within 24 hours, Monday to Friday.

We deliver quality products designed to improve your dog’s health, comfort, and daily well-being.

Address

Let’s keep in touch

Copyright © 2026 StarDeal | Powered by TechWiz

Shopping cart

0
image/svg+xml

No products in the cart.

Continue Shopping